Completed Projects

Construction Waste Processing and Transfer Center

Project Description

Project:   Construction Waste Processing and Transfer Center
Location: Salem, OR
Surface Area:
Year Completed: 2017
Value: $5,900,000
Architect: CH2MHill

This project is located at the southern end of the Salem Airport property, adjacent to Airway Drive SE. The project includes a septage receiving facility, eductor waste dewatering bays, covered drying areas, covered dewatering silt settling basins, a covered clean material and construction debris storage area, stormwater detention basins, a wheel wash facility, and a transportation storage area.

Vancouver Fire Station 1 & 2

Project Description

Project:   Vancouver Fire Station 1 & 2
Location: Vancouver, WA
Surface Area: Fire Station 1 – 18,863sf, Fire Station 2 – 13,367sf
Year Completed: 2018
Value: $12,086,000
Architect: Mackenzie Architecture

Fire Stations 1 & 2 feature apparatus bays, storage mezzanines, administrative office spaces and a full living quarters including a state of the art kitchen and recreational rooms.  Located near downtown Vancouver, WA  Fire Station 1 required extensive coordination and planning for site phasing and storage.  Now operational Fire Stations 1 & 2 are capable of continuing operation and being utilized as an emergency shelter facility in the event of a disaster.

Washington School for the Blind

Project Description

Project:   WSSB New Physical Education Center
Location: Vancouver, WA
Surface Area: 29,100sf
Year Completed: 2007
Value: $9,000,000
Architect: Terra Architecture PC

This project included the demolition of the existing physical education center and construction of a new 29,100 square foot building. With a bent steel roof structure, steel framing and concrete tilt-up construction this facility houses a pool, gymnasium, athletic rooms, general administrative space and main lobby areas. The project was designed and constructed to obtain LEED Silver certification. The mechanical system was designed and engineered to use the pool water to help maintain the heating of the building. This helps reduce the environmental foot print for the building. The WSSB New Physical Education Center electrical system was designed using computer and system programs to reduce the school’s energy use. All of the storm water from the roof and parking lot filters through a bio swale; the largest true bio swale in the State of Washington.

Centennial Industrial Park Lot 1 Building Project

Project Description

Project:   Centennial Industrial Park Lot 1
Location: Vancouver, WA
Surface Area: 124,768sf
Year Completed: 2018
Value: $8,200,000
Architect: Mackenzie Architecture

Construction of approximately 124,768sf industrial building shell in Vancouver, WA. The building is concrete wall tilt-up style on an on-grade concrete slab capable of serving up to five future tenants. Project also includes landscaping, paved parking, drive aisles and trailer parking.