Completed Projects

New Urban High School

Project Description

Project:   New Urban High School
Location: Portland, OR
Surface Area:
Year Completed: 2021
Value: $17,700,000

Architect: Opsis Architecture

Demolition and replacement of the existing 49,350sf New Urban High School building with a new 39,691sf building. Work also includes reconfiguration of the parking area, moving the bus drop off area to the East of the building, upgrades to the site utilities and the Annex building that will service to house students while the new school is being constructed.

Time Lapse 1

Time Lapse 2

WCCCA 911 Center

Project Description

Project:   WCCCA 911 Center
Location: Hillsboro, OR
Surface Area: 30,507 sf
Year Completed: 2022
Value: $18,400,000
Architect: Scott Edwards Architects

The Washington County Consolidated Communications Agency: WCCCA 911 Center project located in Hillsboro, Oregon consists of a new 28,665 square feet, 1-story, Type II-B, fully sprinklered building and all associated site improvements. The completed facility will include office/administration spaces, training classrooms, multi-purpose rooms and an operations room. This facility is classified as and shall be constructed as an Essential Facility with an Occupancy Category IV. The Work will include the furnishing of labor, materials, and equipment for the construction of all work as described in the Drawings and Project Manual including, but not limited to general construction, HVAC, plumbing, electrical, fire protection systems, installation of all owner furnished/contractor installed items.

Valor Middle School Addition & Renovation

Project Description

Project:   Valor Middle School Addition & Renovation
Location: Woodburn, OR
Surface Area: 23,000sf addition to existing Middle School providing new classroom space.  Additionally a renovation to the current Makers Space and Media Center.

Year Completed: 2020
Value: $6,400,000
Architect: Oh Planning+Design

Clean Water Services Rock Creek Engineering Offices Remodel & Addition

Clean Water Services Rock Creek Engineering Offices Remodel & Addition

Project:   Clean Water Services Rock Creek Engineering Offices Remodel & Additions
Location: Hillsboro, OR
Surface Area: 11,200 sf remodel of existing CWS Engineering Offices
Year Completed: 2020
Value: $5,450,000
Architect: DECA Architecture, Inc.

Remodel the existing 9,200-square-foot administration building,reconfiguring the current floorplan and adding an additional 2,000 square feet (sf) of interior space and 1,000 sf of covered exterior space. 

Gubser Elementary School

Project Description

Project:   Gubser Elementary School
Location: Keizer, OR
Surface Area:  Adding 4 classrooms, remodel existing area into kitchen, remodel existing covered play area intro a commons and erect 2 new covered play areas.
Year Completed: 2019
Value: $4,088,000
Architect: Soderstrom Architects

Liberty High School CTE Addition

Project Description

Project:   Liberty High School CTE Addition
Location: Hillsboro, OR
Surface Area:
Year Completed: 2019
Value: $2,790,000
Architect: BLRB Architects, P.S.

Construction of a pre-fabricated metal building and site work to support new building and site.  Classroom Upgrades to finishes, flooring, power, lighting, HVAC, plumbing.  Work will involve some demolition.  Installation of commercial and residential grade equipment.  Site Work

Oregon Zoo Family Farm

Project Description

Project:  Oregon Zoo Family Farm
Location: Portland, OR
Surface Area:
Year Completed: 2004
Value: $877,000
Architect: Ankrom Moisan Associated Architects

Zoo exhibit including a farm house with office space and animal housing and a large barn and barnyard.

Deschutes Co. Fairgrounds RV Park

Project Description

Project:   Deschutes Co. Fairgrounds RV Park
Location: Redmond, OR
Surface Area:
Year Completed: 2007
Value: $3,300,000
Architect: David Evans & Associates

Construction of a 9-acre RV Park.

Beverly-Cleary School

Project Description

Project:   Beverly-Cleary School
Location: Portland, OR
Surface Area:
Year Completed: 2018
Value: $4,675,000
Architect: Oh Planning + Design

Seismic bracing of parapet walls and re-roof with SBS roofing materials and rigid insulation. Replace roof hatches. Replace skylight. Replace gutters and downspouts. Replace existing roof ladders and add new roof ladders. Raise parapets and perimeter walls of some roofs to accommodate new roof level. Raise window sills and replace adjacent windows at selected locations to accommodate new roof level. Install roof fall protection anchors to comply with OSHA Standards. Upgrade roof structure as required for installation of fall protection. Install new rooftop fans and vents with motorized dampers. Demolish, relocate, or install related HVAC and plumbing items within areas of work. Provide new roof drains and overflow drains. Improve existing unisex restrooms on the first and second floors for accessibility compliance including but not limited to compliant signage, clearances, grab bars, and fixtures. Provide new unisex restrooms in the basement and on the second floor. Install ADA compliant guardrail and handrail assemblies in priority interior locations and at exterior main entrance. Install ADA compliant assistive listening system, a portable lift to access the cafeteria platform and new ADA-compliant high-low drinking fountains in corridors. Provide sink, lavatory, and water closet in unisex restrooms. Repair all previously water damaged areas of the structure. Provide new fire sprinkler system throughout the building.

Junction City High School

Project Description

Project:   Junction City High School
Location: Junction City, OR
Surface Area: 37,000sf
Year Completed: 2019
Value: $14,000,000
Architect: DLR Group

Construction of a new 37,000 square foot, 2-story classroom addition including new science classrooms, computer lab and media center.  In additional a new reception area, office spaces and work room as well as a community and digital arts room are being constructed.   Concurrent with the new addition a renovation of approximately 12,000 square feet of existing school space will be completed. Associated site improvements including a large outdoor concrete plaza with terraced seated walls, parking, hardscape, landscape, and utility work.