Completed Projects

Washington County Public Safety Training Center

Subcontractors

Project Documents

Project Description

Project:   Washington County Public Safety Training Center
Location: Hillsboro, OR
Surface Area: 116,029sf
Year Completed: July 2019
Value: $12,700,000
Architect: Scott Edwards Architecture

The Washington County Public Safety Training Center project located in Hillsboro, Oregon consists of complete renovation to an existing 2-story, Type 5-B, fully sprinkled building.  The addition of a second floor within the existing building, a small building addition and all associated site improvements. The completed facility will include office/administration spaces, training classrooms, shooting range, and an armory.

Lewelling Elementary School

Project Description

Project:   Lewelling Elementary School
Location: Milwaukie, OR
Surface Area:
Year Completed: Estimated March 2019
Value: 3,300,000
Architect: BBL Architects

Renovation of existing Lewelling Elementary School including a new fire sprinkler system throughout, interior and exterior painting, replace carpet tile and base in Classrooms, replace plastic laminate wainscot in classroom hallways, and new HVAC unit(s) for Classrooms and IT rooms. At the Administrative Building replace existing glazing with insulated glazing units with new window blinds, new ceramic tile floor and walls at Boys Restroom, and a new backup boiler. Exterior improvements include parking lot repair and ADA upgrades, and new steel framed security fencing with glass and metal panel infill.  Demolish existing portable Classroom and replace with new Music Classroom to the existing Classroom pod building 1 & 2. Convert existing Classroom 18 to (4) offices.

Oak Grove Elementary

Project Description

Project:   Oak Grove School
Location: Portland, OR
Surface Area:
Year Completed: 2018
Value: $2,855,000
Architect: BBL Architects

Renovation of existing Oak Grove Elementary School including Kitchen renovation, interior painting, replace carpet and base in (10) Classrooms, new door hardware, removal and replacement of existing roof and sheet metal over western most Classroom area.  Replace existing glazing with insulated glazing units with new window blinds at select Classrooms, and Administrative Offices. There will also be partial lighting upgrades in the hallways, new fire panel and detection equipment, ,new HVAC unit(s) and controls at select Classrooms.

New Maintenance Facility

Project Description

Project:   New Maintenance Facility
Location: Vancouver, WA
Surface Area:
Year Completed: 2012
Value: $4,100,000
Architect: LSW Architects

Construction of a new maintenance facility.

Clark & Llewellyn Schools

Project Description

Project:   Clark & Llewellyn Schools
Location: Portland,OR
Surface Area: Clark – 50,260sf   Llewellyn – 30,242sf
Year Completed: 2015
Value: $2,600,000
Architect:Oh Planning + Design

The main scope of work on this project was a complete seismic upgrade. Clark Creative Science, existing approx. 50,260 s.f. building, consisting of: re-roof with SBS roofing materials and rigid insulation, replace soffit, fascia boards and climb barriers, raise weeps in existing brick cavity walls to accommodate new roof level, fill in existing roof access door and install new roof hatch, replace existing roof ladders and add new roof ladders, upgrade science classroom with new chemical resistant countertops, new electrical cord reels and new paint and finishes, demolish, relocate or install related electrical items within areas of work, and Hazmat remediation.  Llewellyn Elementary School, existing approx. 30,242 s.f. building, consisting of: demolish existing finishes as required for structural work, install or patch finishes to match existing, demolish, relocate or install related electrical items within areas of work, install seismic bracing walls at selected hollow clay tile wall locations, demolish, relocate, or install related HVAC and plumbing items within areas of work.

Buckman & Sabin Schools

Project Description

Project:   Buckman & Sabin Schools
Location: Portland, OR
Surface Area: sf
Year Completed: 2015
Value: $3,300,000
Architect: Oh Planning + Design

Re-roof and structural upgrades.  Hazardous abatement and mechanical improvements.

Fire Station 92

Project Description

Project:   Fire Station 92
Location: Mercer Island, WA
Surface Area:
Year Completed: 2013
Value: $3,600,000
Architect: Miller Hull Partnership LLP

May Valley Rd Fire Station 78

Project Description

Project:   May Valley Rd Fire Station 78
Location: Issaquah, WA
Surface Area: 9,500sf
Year Completed: 2014
Value: $4,2000,000
Architect: TCA Architecture

Single story building of approximately 9,500 square feet that houses fire station personnel with three (3) drive through vehicle bays and crew living and sleeping and office areas. Composite asphalt shingle roofing, aluminum storefront, overhead doors, fiber cement panel siding and horizontal fiber cement board siding exterior, interior finishes, mechanical, plumbing, fire protection and electrical. The project also included the development of the approximately 2 acres of a 5.79 acre project site which involved site clearing, retaining structures, concrete and asphalt paving, construction of site and frontage improvements and off-site improvements.

Hood River Fire Station

Project Description

Project:   Hood River Fire Station
Location: Hood River, OR
Surface Area:
Year Completed: 2012
Value: $3,300,000
Architect: Group Mackenzie

This project began with the demolition of the existing Fire Station structure and related site work necessary to prepare for the new building. The new, 2-story Fire Station is comprised of approximately 17,900 square feet. It is a wood framed structure with masonry veneer, fiber cement board siding, and aluminum storefront windows. Seismic rehabilitation was also completed. This was a 10 month project.

Ezra Meeker Elementary School

Project Description

Project:   Ezra Meeker Elementary School
Location: Puyallup, WA
Surface Area:
Year Completed: 2006
Value: $5,400,000
Architect: BLRB Architects

This project featured eight individual phases of school renovations coinciding with a complete addition to the school. Corp Inc. Construction worked closely with the School Staff and Management Team to coordinate move-out dates for the classrooms scheduled in each phase of the renovation. All phases of renovation were completed on schedule. Construction included extensive cabinetry upgrades and corridor improvements, the addition of gymnasium and complete hard wood stage with lighting and drapery systems and extensive mechanical upgrades including new boilers and complete hydronics upgrade. In addition, Corp Inc. Construction featured “Builder Bob” days for the students to promote school safety during construction and further students’ understanding of the construction industry.