25th Ave Elementary School

Project Description

Project:   25th Ave Elementary School
Location: Vancouver, WA
Surface Area: 60,000 sf
Year Completed: Estimated Fall 2023
Value: $30,000,000

Architect: LSW Architects, PC

Description: 25th Avenue Elementary School is a new approximately 60,000 square foot two-story K-5 school to include classrooms, dining commons, media center, maker spaces, art space, music space, dance space, fitness space, production kitchen, office and administrative spaces, learning support services spaces, and a Family Community Resource Center (FCRC). The site will include parking, drop off zone for buses, delivery access, outdoor learning spaces, play areas, a covered play area, and will incorporate hard-scape and landscape elements.

New Urban High School

Project Description

Project:   New Urban High School
Location: Portland, OR
Surface Area:
Year Completed: 2021
Value: $17,700,000

Architect: Opsis Architecture

Demolition and replacement of the existing 49,350sf New Urban High School building with a new 39,691sf building. Work also includes reconfiguration of the parking area, moving the bus drop off area to the East of the building, upgrades to the site utilities and the Annex building that will service to house students while the new school is being constructed.

Time Lapse 1

Time Lapse 2

Valor Middle School Addition & Renovation

Project Description

Project:   Valor Middle School Addition & Renovation
Location: Woodburn, OR
Surface Area: 23,000sf addition to existing Middle School providing new classroom space.  Additionally a renovation to the current Makers Space and Media Center.

Year Completed: 2020
Value: $6,400,000
Architect: Oh Planning+Design

Clean Water Services Rock Creek Engineering Offices Remodel & Addition

Clean Water Services Rock Creek Engineering Offices Remodel & Addition

Project:   Clean Water Services Rock Creek Engineering Offices Remodel & Additions
Location: Hillsboro, OR
Surface Area: 11,200 sf remodel of existing CWS Engineering Offices
Year Completed: 2020
Value: $5,450,000
Architect: DECA Architecture, Inc.

Remodel the existing 9,200-square-foot administration building,reconfiguring the current floorplan and adding an additional 2,000 square feet (sf) of interior space and 1,000 sf of covered exterior space. 

Gubser Elementary School

Project Description

Project:   Gubser Elementary School
Location: Keizer, OR
Surface Area:  Adding 4 classrooms, remodel existing area into kitchen, remodel existing covered play area intro a commons and erect 2 new covered play areas.
Year Completed: 2019
Value: $4,088,000
Architect: Soderstrom Architects

Liberty High School CTE Addition

Project Description

Project:   Liberty High School CTE Addition
Location: Hillsboro, OR
Surface Area:
Year Completed: 2019
Value: $2,790,000
Architect: BLRB Architects, P.S.

Construction of a pre-fabricated metal building and site work to support new building and site.  Classroom Upgrades to finishes, flooring, power, lighting, HVAC, plumbing.  Work will involve some demolition.  Installation of commercial and residential grade equipment.  Site Work

Oregon Zoo Family Farm

Project Description

Project:  Oregon Zoo Family Farm
Location: Portland, OR
Surface Area:
Year Completed: 2004
Value: $877,000
Architect: Ankrom Moisan Associated Architects

Zoo exhibit including a farm house with office space and animal housing and a large barn and barnyard.

Beverly-Cleary School

Project Description

Project:   Beverly-Cleary School
Location: Portland, OR
Surface Area:
Year Completed: 2018
Value: $4,675,000
Architect: Oh Planning + Design

Seismic bracing of parapet walls and re-roof with SBS roofing materials and rigid insulation. Replace roof hatches. Replace skylight. Replace gutters and downspouts. Replace existing roof ladders and add new roof ladders. Raise parapets and perimeter walls of some roofs to accommodate new roof level. Raise window sills and replace adjacent windows at selected locations to accommodate new roof level. Install roof fall protection anchors to comply with OSHA Standards. Upgrade roof structure as required for installation of fall protection. Install new rooftop fans and vents with motorized dampers. Demolish, relocate, or install related HVAC and plumbing items within areas of work. Provide new roof drains and overflow drains. Improve existing unisex restrooms on the first and second floors for accessibility compliance including but not limited to compliant signage, clearances, grab bars, and fixtures. Provide new unisex restrooms in the basement and on the second floor. Install ADA compliant guardrail and handrail assemblies in priority interior locations and at exterior main entrance. Install ADA compliant assistive listening system, a portable lift to access the cafeteria platform and new ADA-compliant high-low drinking fountains in corridors. Provide sink, lavatory, and water closet in unisex restrooms. Repair all previously water damaged areas of the structure. Provide new fire sprinkler system throughout the building.

Junction City High School

Project Description

Project:   Junction City High School
Location: Junction City, OR
Surface Area: 37,000sf
Year Completed: 2019
Value: $14,000,000
Architect: DLR Group

Construction of a new 37,000 square foot, 2-story classroom addition including new science classrooms, computer lab and media center.  In additional a new reception area, office spaces and work room as well as a community and digital arts room are being constructed.   Concurrent with the new addition a renovation of approximately 12,000 square feet of existing school space will be completed. Associated site improvements including a large outdoor concrete plaza with terraced seated walls, parking, hardscape, landscape, and utility work.

Lewelling Elementary School

Project Description

Project:   Lewelling Elementary School
Location: Milwaukie, OR
Surface Area:
Year Completed: Estimated March 2019
Value: 3,300,000
Architect: BBL Architects

Renovation of existing Lewelling Elementary School including a new fire sprinkler system throughout, interior and exterior painting, replace carpet tile and base in Classrooms, replace plastic laminate wainscot in classroom hallways, and new HVAC unit(s) for Classrooms and IT rooms. At the Administrative Building replace existing glazing with insulated glazing units with new window blinds, new ceramic tile floor and walls at Boys Restroom, and a new backup boiler. Exterior improvements include parking lot repair and ADA upgrades, and new steel framed security fencing with glass and metal panel infill.  Demolish existing portable Classroom and replace with new Music Classroom to the existing Classroom pod building 1 & 2. Convert existing Classroom 18 to (4) offices.