Oregon Zoo Family Farm

Project Description

Project:  Oregon Zoo Family Farm
Location: Portland, OR
Surface Area:
Year Completed: 2004
Value: $877,000
Architect: Ankrom Moisan Associated Architects

Zoo exhibit including a farm house with office space and animal housing and a large barn and barnyard.

Lynch Elementary School

Project Description

Project:   Lynch Elementary School
Location: Redmond, OR
Surface Area:
Year Completed: 2012
Value: $2,283,000
Architect: BBT Architects

Beverly-Cleary School

Project Description

Project:   Beverly-Cleary School
Location: Portland, OR
Surface Area:
Year Completed: Scheduled for completion 2018
Value: $4,675,000
Architect: Oh Planning + Design

Seismic bracing of parapet walls and re-roof with SBS roofing materials and rigid insulation. Replace roof hatches. Replace skylight. Replace gutters and downspouts. Replace existing roof ladders and add new roof ladders. Raise parapets and perimeter walls of some roofs to accommodate new roof level. Raise window sills and replace adjacent windows at selected locations to accommodate new roof level. Install roof fall protection anchors to comply with OSHA Standards. Upgrade roof structure as required for installation of fall protection. Install new rooftop fans and vents with motorized dampers. Demolish, relocate, or install related HVAC and plumbing items within areas of work. Provide new roof drains and overflow drains. Improve existing unisex restrooms on the first and second floors for accessibility compliance including but not limited to compliant signage, clearances, grab bars, and fixtures. Provide new unisex restrooms in the basement and on the second floor. Install ADA compliant guardrail and handrail assemblies in priority interior locations and at exterior main entrance. Install ADA compliant assistive listening system, a portable lift to access the cafeteria platform and new ADA-compliant high-low drinking fountains in corridors. Provide sink, lavatory, and water closet in unisex restrooms. Repair all previously water damaged areas of the structure. Provide new fire sprinkler system throughout the building.

Junction City High School

Project Description

Project:   Junction City High School
Location: Junction City, OR
Surface Area: 37,000sf
Year Completed: Scheduled for completion 2018
Value: $14,000,000
Architect: DLR Group

Construction of a new 37,000 square foot, 2-story classroom addition including new science classrooms, computer lab and media center.  In additional a new reception area, office spaces and work room as well as a community and digital arts room are being constructed.   Concurrent with the new addition a renovation of approximately 12,000 square feet of existing school space will be completed. Associated site improvements including a large outdoor concrete plaza with terraced seated walls, parking, hardscape, landscape, and utility work.

Lewelling Elementary School

Project Description

Project:   Lewelling Elementary School
Location: Milwaukie, OR
Surface Area:
Year Completed: Scheduled for completion 2018
Value: 3,300,000
Architect: BBL Architects

Renovation of existing Lewelling Elementary School including a new fire sprinkler system throughout, interior and exterior painting, replace carpet tile and base in Classrooms, replace plastic laminate wainscot in classroom hallways, and new HVAC unit(s) for Classrooms and IT rooms. At the Administrative Building replace existing glazing with insulated glazing units with new window blinds, new ceramic tile floor and walls at Boys Restroom, and a new backup boiler. Exterior improvements include parking lot repair and ADA upgrades, and new steel framed security fencing with glass and metal panel infill.  Demolish existing portable Classroom and replace with new Music Classroom to the existing Classroom pod building 1 & 2. Convert existing Classroom 18 to (4) offices.

Oak Grove Elementary

Project Description

Project:   Oak Grove School
Location: Portland, OR
Surface Area:
Year Completed: Scheduled for completion 2018
Value: $2,855,000
Architect: BBL Architects

Renovation of existing Oak Grove Elementary School including Kitchen renovation, interior painting, replace carpet and base in (10) Classrooms, new door hardware, removal and replacement of existing roof and sheet metal over western most Classroom area.  Replace existing glazing with insulated glazing units with new window blinds at select Classrooms, and Administrative Offices. There will also be partial lighting upgrades in the hallways, new fire panel and detection equipment, ,new HVAC unit(s) and controls at select Classrooms.

Clark & Llewellyn Schools

Project Description

Project:   Clark & Llewellyn Schools
Location: Portland,OR
Surface Area: Clark – 50,260sf   Llewellyn – 30,242sf
Year Completed: 2015
Value: $2,600,000
Architect:Oh Planning + Design

The main scope of work on this project was a complete seismic upgrade. Clark Creative Science, existing approx. 50,260 s.f. building, consisting of: re-roof with SBS roofing materials and rigid insulation, replace soffit, fascia boards and climb barriers, raise weeps in existing brick cavity walls to accommodate new roof level, fill in existing roof access door and install new roof hatch, replace existing roof ladders and add new roof ladders, upgrade science classroom with new chemical resistant countertops, new electrical cord reels and new paint and finishes, demolish, relocate or install related electrical items within areas of work, and Hazmat remediation.  Llewellyn Elementary School, existing approx. 30,242 s.f. building, consisting of: demolish existing finishes as required for structural work, install or patch finishes to match existing, demolish, relocate or install related electrical items within areas of work, install seismic bracing walls at selected hollow clay tile wall locations, demolish, relocate, or install related HVAC and plumbing items within areas of work.

Buckman & Sabin Schools

Project Description

Project:   Buckman & Sabin Schools
Location: Portland, OR
Surface Area: sf
Year Completed: 2015
Value: $3,300,000
Architect: Oh Planning + Design

Re-roof and structural upgrades.  Hazardous abatement and mechanical improvements.

Ezra Meeker Elementary School

Project Description

Project:   Ezra Meeker Elementary School
Location: Puyallup, WA
Surface Area:
Year Completed: 2006
Value: $5,400,000
Architect: BLRB Architects

This project featured eight individual phases of school renovations coinciding with a complete addition to the school. Corp Inc. Construction worked closely with the School Staff and Management Team to coordinate move-out dates for the classrooms scheduled in each phase of the renovation. All phases of renovation were completed on schedule. Construction included extensive cabinetry upgrades and corridor improvements, the addition of gymnasium and complete hard wood stage with lighting and drapery systems and extensive mechanical upgrades including new boilers and complete hydronics upgrade. In addition, Corp Inc. Construction featured “Builder Bob” days for the students to promote school safety during construction and further students’ understanding of the construction industry.

Clark College Stout Hall

Project Description

Project:   Clark College Stout Hall
Location: Vancouver, WA
Surface Area:
Year Completed: 2006
Value: $3,700,000
Architect: LSW Architects

This project began with the demolition of the existing Stout Hall structure which housed classrooms, study areas and concessions. The new unique curved structure ties to existing buildings on two sides and is the anchor of the southeast corner of the main campus. The multi-level steel framed structure features 10 smart classrooms, 20 faculty offices, a student lounge and a food vending area. Extensive underground work was necessary to house piping for site utilities, electric power and storm drainage.